150 tons per hour construction waste resource reuse project

150 tons per hour construction waste resource reuse project

  • Production capacity: 150t/h
  • Processing material: construction waste

Project Introduction:

Whether it is "garbage besieged" or "turning waste into treasure" is a hot topic. With the domestic epidemic under control and the provinces gradually reopening and resuming work, the national infrastructure will truly usher in a stage of explosive growth.

Boss Sun used to work on house demolition and relocation, and is very optimistic about the construction waste recycling project. He found the engineering designer of Shanghai Dongmeng, and asked for a crawler-type mobile crushing station with small footprint and high work efficiency. The personnel of our company have designed this production line, which has strong moving ability and strong combining ability. The materials can be processed on the spot, and the system work can be completed in a short time.

Get In Touch With Us

Leave your needs. Your email address will not be published.

Online
Whatsapp
Message